FCE was contracted to clean and remove two 10,000 gallon fiberglass USTs that formerly contained gasoline. FCE faced challenges with limited site access and an underground water line. Buggies were required to remove the broken concrete and earthen material located on top of the tanks. FCE successfully performed CSE and air monitoring and washed the tanks via vacuum truck. The tanks were removed and the remaining contaminated soil excavated and hauled offsite for disposal.